Wärtsilä Oyj

Type: Company
Name: Wärtsilä Oyj (Wartsila Oyj)
Nationality: Finland
Web Address: http://www.wartsila.com/en/
Fact Sheet: Fact Sheet for Wartsila Oyj
First reported Aug 20 2014 - Updated Aug 20 2014 - 1 reports

Wärtsilä to supply control system to Harvey Gulf International Marine

Wärtsilä has been contracted to deliver the control system for a shore-based liquefied natural gas (LNG) fuelling facility in Port Fourchon, Louisiana, US, which is owned by Harvey Gulf International Marine.The facility will be the first source of LNG ... [Published Ship Technology - Aug 20 2014]
First reported Aug 19 2014 - Updated Aug 19 2014 - 1 reports

Diesel generators for Aqualectra arrived

:56WILLEMSTAD — The four Wärtsilä diesel generators that were shipped from Finland, arrived in Curaçao Sunday night August 17th. This news was confirmed by utility company Aqualectra, that had been working hard on the construction of a new diesel station ... [Published Amigoe.com - Aug 19 2014]
First reported Aug 18 2014 - Updated Aug 19 2014 - 10 reports

supply control system for the Harvey Gulf shore-based LNG fuelling facility

Contract Awarded for in Port Fourchon, Louisiana .Contract Awarded Date: Aug 2014The facility is owned by Harvey Gulf International Marine , and will be used to supply fuel to Harvey Gulf~s fleet of LNG powered platform supply vessels (PSV). The onshore ... [Published HispanicBusiness.com - Aug 19 2014]
First reported Aug 18 2014 - Updated Aug 18 2014 - 1 reports

Quality spare parts bring cost savings and help reduce environmental impact

Environment , Marine Equipment Products and Services — By admin on August 18, 2014 at 8:34 PMShort-term cost savings may turn out costly when it comes to spare parts. According to Wärtsilä, original equipment manufacturer (OEM) spare parts can have up ... [Published All About Shipping - Aug 18 2014]
First reported Aug 18 2014 - Updated Aug 18 2014 - 1 reports

Share buy-back week 33/2014

1Aspo Group Interim Report January 1 to June 30, 20142WENDEL : Materis completes successful refinancing of Materis Paints and Chryso, and enters into exclusive talks to sell Chryso3Thinfilm Named Finalist in 2014 CTIA E-Tech Awards4Basilea appoints Chief ... [Published EuroInvestor - Aug 18 2014]
First reported Aug 07 2014 - Updated Aug 08 2014 - 2 reports

Wärtsilä wins MPSV design contract from Tidewater

Wärtsilä has secured a new design contract for a multi-purpose platform supply vessel (MPSV) from Tidewater, a US-based provider of offshore service vessels.The order comes with an option for a further three similar vessels. The new MPSV will be built ... [Published Ship Technology - Aug 08 2014]
First reported Aug 07 2014 - Updated Aug 08 2014 - 8 reports

Wärtsilä awarded another design contract for arctic operations

A second confirmed design contract for Wärtsilä's new series of arctic platform supply vessels has been signed. This latest order is for a multi-purpose platform supply vessel (MPSV) being built by Tersan Shipyard in Turkey on behalf of U.S.- based ... [Published Scandinavian Oil-Gas Magazine - Full Feed - Aug 08 2014]
First reported Aug 07 2014 - Updated Aug 07 2014 - 2 reports

Tidewater Subsidiary Orders Wärtsilä-Designed Ice-Class MPSV

The new Wärtsilä Ship Design multi-purpose platform supply vessel features a compact design yet with a high deadweight giving maximum cargo capacity.Wärtsilä signed their second design contract today with Tidewater subsidiary Troms Offshore Supply for ... [Published GCaptain - Aug 07 2014]
First reported Aug 05 2014 - Updated Aug 06 2014 - 2 reports

Eco-Ferry Planned for Northern Europe Route

Wärtsilä is designing the ferry with varied operating conditions in mindA new eco-ferry is being planned that will serve Bothnian Corridor between Vaasa, Finland and Umeå, Sweden, according to Wärtsilä Corp. (Wärtsilä), which will design the vessel ... [Published Ship & Bunker - Aug 05 2014]
First reported Aug 04 2014 - Updated Aug 05 2014 - 5 reports

Wärtsilä secures Gulf of Bothnia ferry design contract

Wärtsilä has been awarded a contract to support the designing of a new ferry as part of the European Union-sponsored Midway Alignment of the Bothnian Corridor project.The contract includes both initial and basic designs of the ferry, which is proposed ... [Published Ship Technology - Aug 05 2014]
First reported Aug 04 2014 - Updated Aug 04 2014 - 3 reports

Wärtsilä to design new ferry for Gulf of Bothnia link

AUGUST 4, 2014 — Wärtsilä has been selected to design a new ferry that will be a key part of an EU sponsored project intended to strengthen transportation links between Finland and Sweden. The ferry is designed for sailing between Vaasa in Finland and ... [Published Marine Log - Aug 04 2014]
First reported Jul 24 2014 - Updated Jul 25 2014 - 10 reports

Wärtsilä ditches Qingdao jv

Dalian: Finnish engine firm Wärtsilä will divest its shares in the Qingdao Qiyao Wärtsilä MHI Linshan Marine Diesel Co Ltd (QMD), the joint venture company established for manufacturing large low-speed marine diesel engines. Wärtsilä’s shares in the joint ... [Published Sino Ship News - Jul 25 2014]

Quotes

"Both Harvey Gulf and Wärtsilä are fully committed to promoting environmentally sustainable operations, and by facilitating the use of LNG as a marine fuel, this philosophy is clearly enhanced."
...General manager Albert Elens of Seawings explained: "As these generators are quite large, the company Miles Transport purchased a huge trailer, which shows the island is very progressive. The generators will be unloaded one by one and placed temporarily on a trailer at CPS, prior to transportation to the Dokweg.” Elens “stressed that this kind of special transports requires much planning and logistical coordination”, and that “permits had to be requested from as many as four different government bodies  for transporting the generators by road”. The first generator will be transported as planned next Wednesday, the second on Saturday, the third on Tuesday and the last one on Thursday."
"The Harvey Gulf PSVs are to be fitted with the Wärtsilä LNGPac gas control system, so it was natural that the same basic technology should also be used for the shore fuelling facility. There is a growing need for an LNG fuelling infrastructure in the Gulf of Mexico, so this represents an important step forward. Both Harvey Gulf and Wärtsilä are fully committed to promoting environmentally sustainable operations, and by facilitating the use of LNG as a marine fuel, this philosophy is clearly enhanced" says Joe Amyot, Sales Director, Wärtsilä Ship Power
"Obviously, if we felt that what we had already was ideal we wouldn't be looking at this potential change" Coleman said

More Content

All (194) | News (140) | Reports (0) | Blogs (40) | Audio/Video (0) | Fact Sheets (6) | Press Releases (8)
sort by: Date | Relevance
Mare Forum’s Athens Iron Ore and Coal World Shi... [Published All About Shipping - Aug 20 2014]
Wärtsilä to supply control system to Harvey Gul... [Published Ship Technology - Aug 20 2014]
Diesel generators for Aqualectra arrived [Published Amigoe.com - Aug 19 2014]
Wärtsilä Supplying Control System for U.S. LNG ... [Published Ship & Bunker - Aug 19 2014]
Wartsila to supply control system for Harvey Gu... [Published TVNewsCheck - Aug 19 2014]
Offshore Marine Asia pushing the boundaries [Published MyNewsDesk - Aug 19 2014]
supply control system for the Harvey Gulf shore... [Published HispanicBusiness.com - Aug 19 2014]
Wärtsilä to supply control system for Harvey Gu... [Published Scandinavian Oil-Gas Magazine - Aug 19 2014]
Quality spare parts bring cost savings and help... [Published All About Shipping - Aug 18 2014]
Wärtsilä to supply control system for Harvey Gu... [Published World Oil - Aug 18 2014]
Wärtsilä to Supply Harvey Gulf LNG Fueling Faci... [Published Maritime Executive - Aug 18 2014]
Wärtsilä secures contract for Gulf of Mexico LN... [Published Marine Log - Aug 18 2014]
Wärtsilä to supply equipment for US LNG-bunkeri... [Published Seatrade Global - Aug 18 2014]
Wärtsilä control system for US facility [Published Motor Ship - Aug 18 2014]
Wartsila to supply control system for Harvey Gu... [Published Individual.com - Aug 18 2014]
Wärtsilä to supply control system for LNG fuell... [Published LNG Industry - Aug 18 2014]
Share buy-back week 33/2014 [Published EuroInvestor - Aug 18 2014]
Wärtsilä to supply control system for Harvey Gu... [Published Reuters - Aug 18 2014]
Global Diesel Genset Market Forecast and Opport... [Published Street Sweeper - Aug 15 2014]
New Zealand to cut navy’s IPV fleet [Published Naval Technology - Aug 14 2014]
Watch: The New Generation of Fishing Vessels Fr... [Published MaritimeSecurity.Asia - Aug 14 2014]
VIDEO: Wärtsilä Takes Fishing to Another Level [Published World Maritime News - Aug 13 2014]
Ro-Ro Ships: Finnlines scrubs up [Published Ships Monthly - Aug 12 2014]
Uzmar Christens More Top End River Pushboats [Published SeaNews - Aug 11 2014]
Service sector now face severest threat of redu... [Published Noodls - Aug 08 2014]
Wärtsilä wins MPSV design contract from Tidewater [Published Ship Technology - Aug 08 2014]
Wärtsilä awarded another design contract for ar... [Published Scandinavian Oil-Gas Magazine - Full Feed - Aug 08 2014]
Wärtsilä awarded second vessel design contract ... [Published Offshore oil and gas - Aug 07 2014]
Further order for Wärtsilä Arctic PSV [Published Motor Ship - Aug 07 2014]
Wärtsilä to Design Arctic MPSV for Tidewater [Published Maritime Executive - Aug 07 2014]
1 2 3 4 5 6 7
In Focus
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
Content Volume
Document Volume
Network
Network

Blogs

sort by: Date | Relevance
Watch: The New Generation of Fishing Vessels Fr... [Published MaritimeSecurity.Asia - Aug 14 2014]
Based on close to 40 years of experience and our designers extensive knowledge, Wärtsilä has developed a new generation of fishing vessels, more fuel efficient than ever. Harvest (VS6108 PS/TR), delivered in 2014 is one of these designs, where the combination ...
Tidewater Subsidiary Orders Wärtsilä-Designed I... [Published MaritimeSecurity.Asia - Aug 07 2014]
The new Wärtsilä Ship Design multi-purpose platform supply vessel features a compact design yet with a high deadweight giving maximum cargo capacity. Wärtsilä signed their second design contract today with Tidewater subsidiary Troms Offshore Supply ...
Wartsila to Design Innovative and Environmental... [Published MaritimeSecurity.Asia - Aug 04 2014]
Wärtsilä has been selected as the partner for designing a new ferry as part of the ‘Midway Alignment of the Bothnian Corridor’ project. The scope of the design work will be both initial and basic design. The ferry is designed for sailing between Vaasa ...
Wärtsilä, CSSC Establish Engine JV – The Mariti... [Published MaritimeSecurity.Asia - Jul 18 2014]
‘) > -1 ) {var begscript_start = strcode.indexOf(”, begscript_start);var endscript_end = strcode.indexOf(‘>’, endscript_start);scripts.push(strcode.substring(begscript_end+1, endscript_start));strcode = strcode.substring(0, begscript_start) + ...
Two new Wärtsilä JVs with CSSC: 2-stroke engine... [Published Green Car Congress - Jul 18 2014]
Wärtsilä and China State Shipbuilding Corporation (CSSC)—one of the largest shipbuilders in the world—will form two new joint ventures. The first will take over Wärtsilä’s 2-stroke engine business. Through the agreement, CSSC will own 70% of the business ...
1 2 3 4 5 6 7 8

Press Releases

sort by: Date | Relevance
WÄRTSILÄ INTERIM REPORT JANUARY-JUNE 2014 [Published GlobeNewswire: Acquisitions News - Jul 18 2014]
Wärtsilä establishes joint venture with China S... [Published GlobeNewswire: Advertising News - Jul 18 2014]
Wärtsilä Selects ClickSoftware's ClickWorkforce... [Published Financial Services - May 08 2014]
WÄRTSILÄ INTERIM REPORT JANUARY-MARCH 2014 [Published GlobeNewswire: Advertising News - Apr 24 2014]
Wärtsilä's Interim Report January-March 2014 to... [Published GlobeNewswire: Advertising News - Apr 10 2014]
1 2
Contact Us
Sales
Support


Freebase CC-BY Some image thumbnails are sourced from Freebase, licensed under CC-BY

Copyright (C) 2014 Silobreaker Ltd. All rights reserved.
The selection and placement of stories and images on any Silobreaker page are determined automatically by a computer program.
The time or date displayed reflects when an article was added to or updated in Silobreaker.